Charging station replacement in 1.5 hours
The DUO ims can be installed on existing foundations and enables a complete charging station replacement in around 1.5 hours. This allows Westenergie to reduce investment and operating costs while providing a stable, comprehensive charging infrastructure.
Regulatory compliance and readiness for future standards
With LTE (4G) communication, the charging infrastructure is future-proof even after the planned 2G shutdown. The DUO ims meets all relevant technical and regulatory requirements, including AFIR, TAB, and upcoming specifications for smart metering systems. Municipalities benefit from a reliable, powerful and scalable solution for public spaces.
(Image credit: © Westenergie)
Future-proofing municipal charging infrastructure
Germany’s largest energy service provider and infrastructure provider, Westenergie, is working with Compleo Charging Solutions to modernize the public charging infrastructure in its network area. By 2028, more than 650 charging stations in municipalities in North Rhine-Westphalia, Lower Saxony, and Rhineland-Palatinate will be replaced by the DUO ims AC charging solution. The focus is on quick and cost-effective replacement of existing infrastructure without new construction and with minimal effort for the municipalities.
Learn more about the AC station for direct gird connections: DUO ims
Commissioned by
Westenergie
AG
Hardware
650x
DUO ims
Location
NRW, Lower Saxony,
Rhineland-Palatinate (GER)
Backend
Operator-specific, municipal backend
Commissioning
2025 -
2028
Use Case
public
"In Compleo, we have a partner at our side who shares our understanding of cooperation and responsibility and with whom we are jointly laying the foundations for the charging infrastructure of the future."
Kristina Wagner, Senior Commercial Manager and Product Owner eMobility at Westenergie